TY - JOUR T1 - Hysteretic performance of a new blind bolted connection to concrete filled columns under cyclic loading: An experimental investigation JO - Engineering Structures UR - https://doi.org/10.1016/j.engstruct.2012.08.020 PY - 2013/02/10 AU - Tizani W AU - Wang ZY AU - Hajirasouliha I ED - DO - DOI: 10.1016/j.engstruct.2012.08.020 PB - Elsevier BV VL - 46 SP - 535 EP - 546 Y2 - 2025/11/05 ER -